Illustrative project concept
Commercial solar + energy storage

Solar + storage.
Built around
your business.

See how solar or batteries could lower energy costs, support backup power and fit your budget. Tell us about the property, then request a proposal.

Get my project checklist ↗

For commercial property owners, business operators and property managers.

See your project plan before sharing contact detailsNew projects welcome
What you get

A proposal you can
make a decision on.

Start with your goals. The next step is a closer look at the site, the costs and what the project could deliver.

01 / PROJECT FIT

A system that fits

Solar, batteries or both, based on your space, energy use and priorities.

02 / ECONOMICS

The numbers

Project cost, estimated savings, ongoing expenses and payback. See the assumptions behind the returns.

03 / CAPITAL

Ways to pay

Compare a purchase, loan, lease or power purchase agreement, where available.

04 / EXECUTION

A realistic schedule

Site checks, utility approvals, equipment and installation timing.

Get my project checklist →

Start without a utility-bill upload. Pricing and financial estimates come after we review your site and energy use.

Start with your property

What are you planning?

Answer a few questions. Get a starting plan and checklist. Share your details only when you’re ready to talk about a proposal.

Ready to talk now?

1 OF 4 / PROJECT DIRECTION

What are you interested in?

You don’t need to know the system size or technical details.

Select an option to continue. You can go back and change it.

Incentives + timing

Starting a new project?
You still have options.

New solar projects may still qualify for federal credits with a 2027 completion. Battery-only projects follow a different timeline. Your location and utility may offer other opportunities.

Research checked October 21, 2026

Eligibility depends on the project. Credits and deductions are different from cash savings.

Qualifying projects may receive a 30% federal credit

The enhanced rate depends on meeting applicable labor rules or an exception. Project timing, equipment sourcing and other requirements also apply.

IRS: credit structure ↗ · Sourcing requirements ↗
New solar: plan for the 2027 deadline

New solar must generally be placed in service by December 31, 2027 to qualify for these credits. Site readiness, utility approvals and equipment lead times will shape what is achievable.

Batteries: a separate timeline

Standalone storage is excluded from that solar-specific deadline. Its value depends on your utility rate, demand peaks, backup needs and total cost.

IRS: storage exception ↗
Already started? Check which deadline applies.

Solar projects with a qualifying construction start on or before July 4, 2026 may remain eligible beyond 2027, subject to continuity and all other requirements. For later starts, the general placed-in-service deadline is December 31, 2027. Beginning construction and maintaining continuity are separate tests; a proposal, deposit or SPV alone does not establish eligibility. Have the evidence reviewed by your tax advisers.

IRS: statutory dates and storage exception ↗
Local programs can change the numbers

Check state and utility incentives alongside federal benefits. Compare the project with and without uncertain incentives before committing capital.

Storage with a purpose

What could a battery
do for your business?

Start with the bill and the equipment you need to keep running. Then check whether the benefits justify the battery’s cost.

PEAK DEMAND

Manage costly spikes.

A battery may reduce demand charges by supplying power during expensive peaks. Your rate and usage pattern determine the potential savings.

TIME-OF-USE

Shift when you buy power.

Where rates change by time of day, a battery can charge when power costs less and discharge when it costs more. Losses and operating costs matter.

CONTINUITY

Keep key equipment running.

Choose the equipment you want to back up and for how long. Backup needs specific controls and system design.

Benefits depend on tariff, controls, interconnection and design. Revenue streams may conflict; a financial model must account for those trade-offs.

NYSERDA: commercial storage overview ↗
Payment options

Compare the ways
to pay for your project.

Structure What you evaluate The key question
Cash purchase Upfront cost, tax benefits and long-term returns How much capital do you want to commit?
Commercial loan Payments, interest rate, term and collateral Do expected savings support the payments?
Lease / power purchase agreement Payments, escalation, responsibilities and exit terms Who owns the system and receives incentives?
C-PACE, where available Property assessment, local eligibility and lender consent Does the structure fit your property and financing?

Options require provider and project review. Rates, terms and availability are not quoted in this initial screen.

DOE: commercial energy financing ↗
Larger projects + portfolios

One property or a portfolio?
Plan the ownership too.

For larger projects, ask about ownership and special-purpose vehicle (SPV) coordination. We can discuss the site rights, financing and contracts that need to come together with your legal and tax advisers.

An SPV alone does not secure a tax credit or extend a deadline. Legal, tax and financing services require a separately agreed scope.

Discuss my project structure ↗
Before you start

A few things you may be wondering.

What happens after I request a proposal?

We start with the details you send. Site rights, utility bills and property information help establish what can be built before detailed design, pricing and financial estimates. Submitting a request does not commit you to a project.

Do I need utility bills or drawings?

Not to start. Your state, property type and approximate electricity bill are enough for this first step. We’ll need more detail before preparing a proposal.

I missed an earlier solar deadline. Is it still worth asking?

Yes. New solar may still qualify if placed in service by December 31, 2027 and otherwise eligible. Batteries follow a separate federal timeline. The next step is checking which options and schedules fit your site.

What return could my property achieve?

It depends on the property, utility rate, installed cost, incentives and financing. A financial model should show ongoing expenses, payback and returns, including what changes if savings or incentives are lower than expected.

Can batteries operate without solar?

Yes. A battery can be considered on its own. Your utility rate, electricity use, backup needs and installation costs determine whether it makes financial sense.

Will the system run my entire building during an outage?

That requires a specifically designed backup solution. Critical loads, power demand, energy capacity and islanding equipment determine what can run and for how long.

What if I own multiple properties?

Start with one property or choose the portfolio option in the form. We can discuss which locations are worth a closer look based on their bills, space and ownership.

Commercial solar + storage